September 2012


YEAR 2012.

Nizhnevartovsk.

We have fulfilled the installation of a gas turbine General Electric weighing 290 tons and generator weighing 218 tons by the hydraulic rigging system SBL1100 capacity of 1100 tons. To install the turbine on the support it was lifted to a height of 6 meters and was moved above the foundation of generator at distance of 36 meters.