August – September 2016

Kamensk-Uralskii In the new shop of Kamensk-Uralsky Metallurgical Works have been carried out works for assembling of the rolling mill. The JSC "Titran" performed the installation of housings of roughing stands. Two housings weighing 510 and 520 tons should have been canted in vertical position, moved onto ......

read more
May – July 2016

Concern "Rosenergoatom" set for SC "Titran" difficult and responsible task - to replace the stator of generator 1 million kW power during the repair of the 3rd unit of Kalinin Nuclear Power Plant. Have been performed works for transportation, lifting, moving, loading and installation in the project position of two ......

read more
April 2016

St. Petersburg. On the Baltic Shipyard were carried out lifting and installation of two tanks of metal-water protection on the largest nuclear-powered icebreaker "Arktika". Height of lifting is 18 meters, weight of each tank is 250 tons. ....

read more
April 2015

Afipsky refinery. In April 2015 on Afipsky oil refinery were carried out works of the movement of the vacuum column K-601 (weight 256 tons, diameter 9360 mm, length 35775 mm) above the acting overpass of technological pipelines....

read more
May 2013

Novocherkassk. In May 2013 on Novocherkassk power plant were carried out works of lifting and installation of the generator stator weighing 320 tons to a height of 11 meters....

read more
January-February 2013

YEAR 2013. Nizhnevartovsk. Difficult rigging operation of lifting HRSG drums to a height of 35 meters indoors was performed by specialists of JSC «Titran" in January-February 2013 in Nizhnevartovsk. The task was complicated by the cramped conditions of work and absence of auxiliary cranes. The basic part of ......

read more
September 2012

YEAR 2012. Nizhnevartovsk. We have fulfilled the installation of a gas turbine General Electric weighing 290 tons and generator weighing 218 tons by the hydraulic rigging system SBL1100 capacity of 1100 tons. To install the turbine on the support it was lifted to a height of 6 meters and was moved above the ......

read more
June 2012

Perm. Crane-independent installation of gas turbine and generator weighing 196 and 176 tons on the foundation of 7 meters height....

read more
December 2011 – February 2012

The gas turbine power station of Novy Urengoy Gas-Chemical Complex. JSC "Titran" carried out works for transportation from the warehouse of temporary storage to the installation site and the installation on foundations of two gas turbine generators (weight of 79 tons each), a steam turbine generator (weight of 78 ......

read more
2011

Liski. Unloading of heavy seats up to 150 tonnes from the barge to the pier carried out by rigging crane-independent method...

read more