The gas turbine power station of Novy Urengoy Gas-Chemical Complex.
JSC “Titran” carried out works for transportation from the warehouse of temporary storage to the installation site and the installation on foundations of two gas turbine generators (weight of 79 tons each), a steam turbine generator (weight of 78 tons) and the condenser of steam turbine (weight 62 tons). Before installation to foundations all units have been rotated on 90 degrees.