The transporting, lifting to 9 meters, moving and installation on the foundation of the steam turbine SIEMENS 110 tons and ABB generator 61 tons.
Perm
The transporting, lifting to 9 meters, moving and installation on the foundation of the steam turbine SIEMENS 110 tons and ABB generator 61 tons.