Concern “Rosenergoatom” set for SC “Titran” difficult and responsible task – to replace the stator of generator 1 million kW power during the repair of the 3rd unit of Kalinin Nuclear Power Plant. Have been performed works for transportation, lifting, moving, loading and installation in the project position of two stators weighing 342 tons each, lifting height is 17 meters.

At the same time with the works for the replacement of stator was performed moving of  modules of low pressure capacitors at distance to 90 meters.