![](assets/galleries/87/01.jpg)
![](assets/galleries/87/02.jpg)
Amursk 2020 – together with “Spetsstroymash” LLC
Unloading and installation of an autoclave of 1000 tons with a hydraulic lifting system SBL 1100 were carried out at the facility “Amur Hydrometallurgical Plant”.
Amursk 2020 – together with “Spetsstroymash” LLC
Unloading and installation of an autoclave of 1000 tons with a hydraulic lifting system SBL 1100 were carried out at the facility “Amur Hydrometallurgical Plant”.