November 2019


Nizhnekamsk

The unique work of rigging a generator weighing in at 250 tons and a turbine weighing in at 110 tons was carried out by our specialists in Nizhnekamsk. The peculiarity of this project is that the load was lifted to a height of over 7 meters and moved 50 meters without support on the foundations. That means the load traveled the entire distance on the structures of the rigging system of JSC “Titran”. At the same time, the work was carried out in the building – the axes of the columns and floor trusses were mounted – access to the installation and dismantling of the rigging system was very difficult. Nevertheless, the work was completed on time!