Perm. Crane-independent installation of gas turbine and generator weighing 196 and 176 tons on the foundation of 7 meters height....
read more
Perm. Crane-independent installation of gas turbine and generator weighing 196 and 176 tons on the foundation of 7 meters height....
read more
The gas turbine power station of Novy Urengoy Gas-Chemical Complex. JSC "Titran" carried out works for transportation from the warehouse of temporary storage to the installation site and the installation on foundations of two gas turbine generators (weight of 79 tons each), a steam turbine generator (weight of 78 ......
read more
Liski. Unloading of heavy seats up to 150 tonnes from the barge to the pier carried out by rigging crane-independent method...
read more
Introduced to the work Hydraulic Lifting system 500-ton lifting capacity lifting height up to 18 meters Installation on the Foundation 2 SIEMENS generators weighing 320 tons size 13000х4064х4159. Kirishi...
read more
Perm The transporting, lifting to 9 meters, moving and installation on the foundation of the steam turbine SIEMENS 110 tons and ABB generator 61 tons...
read more
Lifting generator weighing 59 tonnes to 7.0 m. the Horizontal displacement at the Foundation was carried out the side of the generator. Voronezh...
read more
Sredneuralsk The lifting of generator weighing 185 tons on height of 12.0 meters. Movement at distance of 45 meters. Lifting and moving of turbine of 110 tons weight....
read more