January 2021 Ekibastuz, Republic of Kazakhstan Mobilization of equipment and personnel during the New Year holidays, amid the limitations of the Covid-19 pandemic. Unloading from vehicles, moving to the workshop and installation in the design position of 4 wheel machining centers weighing 40 tons each....
JSC “Titran” performed rigging, overturning (tilting by 180 °) and installing the base of a vacuum chamber weighing over 100 tons in the design position at one of the enterprises of Roskosmos in Krasnoyarsk krai. The base diameter of the chamber exceeded 14 meters....
Nizhnekamsk The unique work of rigging a generator weighing in at 250 tons and a turbine weighing in at 110 tons was carried out by our specialists in Nizhnekamsk...
Volgodonsk From the end of 2017 to october 2018, our company performed dismantling, moving, erection, commissioning, as well as acceptance tests of the unique Schiess IFBW horizontal boring mill...
St. Petersburg In July 2018, in the city on the Neva, repair work was carried consisting of the replacement of the return cylinders and the replacement of the master cylinder seal set on a German forging press with a force of 1600 Nm....
St. Petersburg In May 2018, "Titran" performed work on dismantling a set of autoclaves at the site of the LSR aerated concrete plant located on Oktyabrskaya Embankment in St. Petersburg...